Tuesday, October 9, 2018
Township Road Work on
The township is planning on upgrading 608th street to the East of Mantorville. This is the same street that the residents on Bergmann and Mantor drive are using during the 5th street construction. The City's Engineer has been in contact with Mantorville Township and they have shared with us that they plan to do all work "under traffic" which means there will be times during the construction that the road will be down to one lane; however, traffic will be able to move through with the help of flaggers so that the citizens that would normally use 5th street will have a route out of the City.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment